Jehangir Hospital Project

Project Description

Package Containerised STP for Hospital

Problem

Quantity of sewage effluent 135.0 M3/Day. Low space & existing setup. No area to construct the collection tank of higher capacity. Low Noise requirement as Hospital is Silence Zone


Solution

Package containerized plant constructed. Extra Collection tank located above the package STP. Sludge Drying Included in same system Automatic relay logic. Low Noise.